LB May 2017 Irradiation Day
30 MeV Beam 1 uA current (possibly?)
50% Se Soil Mix
Date | Sample | Document Title | Start | Stop | Runtime (s) | Position |
5/23/17 |
Timing Cut Information for 50% Se Run (based on Det B time)
30 MeV Beam 1 uA current (possibly?)
Date | Sample | Document Title | Start | Stop | Runtime (s) | Position |
5/23/17 |
Timing Cut Information for 50% Se Run (based on Det B time)