Cf252 2017

From New IAC Wiki
Jump to navigation Jump to search

runs

goback

05/16/17

The following configuration was used for runs 6302 through 63??.

4" by 4" scintillators are fixed 5" directly above and below the Cf252 source simultaneously. An OR between these two scintillators serves as the TDC start. The two scintillators are connected to the CFD and given a threshold of 172 mV, and a HV of -1700 V.

The neutron detector array has the exact same configuration used during the runs occurring on 05-2-2017 and 05-3-2017.

TDC mapping is the same as usual for neutron detector array. For the timing scintilators:

PMT above src: TDC1190[1][26]

PMT below src: TDC1190[1][25]

OR of both: TDC1190[1][27]