DOE EPSCoR 2017

From New IAC Wiki
Revision as of 23:20, 14 December 2016 by Foretony (talk | contribs)
Jump to navigation Jump to search

Propose the investigation of a Moderator for a Polarized Positron Source (either at JLab or for Niowave)

Niowave designs and Builds a de-acelerator

IAC tests it using the LBE + Solenoid system installed at the IAC.


File:VPR Memo 12-5-22016.docx


Forest_DOE