Difference between revisions of "201401 R1ProgressRep"
Jump to navigation
Jump to search
| Line 10: | Line 10: | ||
1. magnet | 1. magnet | ||
| − | 2. | + | 2. palette |
| + | 3. chamber | ||
| + | |||
| + | Note: | ||
| + | Replace right backside wood mounting piece for boarding. Broke the one for S5 packaging and replaced with one from another set. | ||
Revision as of 19:13, 4 January 2014
Shipping Manifest:
- Thick plastic window covers used during stringing
- 1 stringing machine
- old ADB crate
- 1 magnet
Order to pull equipment out that requires a crane:
1. magnet 2. palette 3. chamber
Note: Replace right backside wood mounting piece for boarding. Broke the one for S5 packaging and replaced with one from another set.