12/09/2013: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Abdehait (talk | contribs)
Abdehait (talk | contribs)
Line 33: Line 33:
|-
|-


 
|6900|| on ||  on || ||
|-





Revision as of 23:10, 10 December 2013

Background (shutter open)

Run Number Beam Time Notes
6858 on 3'28" V_CAT= 2.5kV, V_GEM=2.2 kV measuring the background without expecting a signal.(amplified twice)using PS777
6859 on V_CAT= 2.5kV, V_GEM=2.2 kV measuring the background, expecting a signal. (amplified once)
6860 on V_CAT= 2.9kV, V_GEM=2.6kV measuring the background (amplified once)
6861 off V_CAT= 2.9kV, V_GEM=2.6kV measuring the background (amplified once)
6862 on V_CAT= 3.15kV, V_GEM=2.85kV measuring the background (amplified once)

scope pic


GO BACK [1]
Run Number Beam detector Time Notes
6899 on on everything is working
6900 on on