Difference between revisions of "12/09/2013"

From New IAC Wiki
Jump to navigation Jump to search
Line 26: Line 26:
  
  
 +
{| border="1" cellpadding="4"
 +
|-
 +
|Run Number || Beam ||  detector || Time  || Notes
 +
|-
 +
|6899|| on ||  on || || everything is working
 +
|-
  
  

Revision as of 23:03, 10 December 2013

Background (shutter open)

Run Number Beam Time Notes
6858 on 3'28" V_CAT= 2.5kV, V_GEM=2.2 kV measuring the background without expecting a signal.(amplified twice)using PS777
6859 on V_CAT= 2.5kV, V_GEM=2.2 kV measuring the background, expecting a signal. (amplified once)12 9 13 bk 2.2 2.5.png
6860 on V_CAT= 2.9kV, V_GEM=2.6kV measuring the background (amplified once)12 9 13 bk 2.5 2.8.png
6861 off V_CAT= 2.9kV, V_GEM=2.6kV measuring the background (amplified once)12 9 13 bk 2.6 2.9.png
6862 on V_CAT= 3.15kV, V_GEM=2.85kV measuring the background (amplified once)12 9 13 bk 2.6 2.9.png

scope pic

12 9 13 beamon 2.85 detector is on.png

12 9 13 beamon 2.85 detector isoff.png


GO BACK [1]
Run Number Beam detector Time Notes
6899 on on everything is working