12/09/2013: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Abdehait (talk | contribs)
Abdehait (talk | contribs)
Line 11: Line 11:
|-
|-


 
|6860 || on || 3'28" || V_CAT= 2.8kV, V_GEM=2.5kV measuring the background as the beam is on without expecting a signal. (amplified once)[[File: 12_9_13_bk_2.5_2.8.png | 40 px]]
|-




|}
|}

Revision as of 15:16, 9 December 2013

Background

Run Number Beam Time Notes
6858 on 3'28" V_CAT= 2.5kV, V_GEM=2.2 kV measuring the background as the beam is on without expecting a signal.(amplified twice)using PS777
6859 on 3'28" V_CAT= 2.5kV, V_GEM=2.2 kV measuring the background as the beam is on without expecting a signal. (amplified once)
6860 on 3'28" V_CAT= 2.8kV, V_GEM=2.5kV measuring the background as the beam is on without expecting a signal. (amplified once)