Difference between revisions of "PosRun 10 14 2013"
Jump to navigation
Jump to search
Line 38: | Line 38: | ||
|} | |} | ||
+ | ===40 MeV on Tungsten=== | ||
+ | |||
+ | {| border="1" |cellpadding="20" cellspacing="0 | ||
+ | |- | ||
+ | | Run # || Run Duration (s) || Configuration | ||
+ | |- | ||
+ | | 6503 || min s ( pulses) || same as above except: REmoved Al brick beam stop | ||
+ | |} | ||
==FC -vs- 90A beam stop correlation== | ==FC -vs- 90A beam stop correlation== |
Revision as of 19:51, 14 October 2013
Run list
Scaler channel #2 counts the number of beam pulses
Detector 4 is Beam Left and in ADC channel 7, Ortec Dual Spec amp set to course=10, fine=39, Canberra CFD set to 85 mV lower threshold
Detector 1 is Beam Right and in ADC channel 3, Ortec Dual Spec amp set to course=20, fine=10, Canberra CFD set to 70 mV lower threshold
In-flight
40 MeV on Tungsten
Run # | Run Duration (s) | Configuration |
6503 | min s ( pulses) | same as above except: REmoved Al brick beam stop |
FC -vs- 90A beam stop correlation
FC = Aluminum brick 2" from exit window near NaI detectors
50 Ohm scope termination
90 A BS (nVs) | FC (nVs) |
47 | 25 |
24 | 11.9 |
13 | 6 |
6.1 | 2.3 |
4.8 | 1.8 |