Difference between revisions of "PosRun 10 14 2013"

From New IAC Wiki
Jump to navigation Jump to search
Line 14: Line 14:
 
|      ||  min  s  ||  
 
|      ||  min  s  ||  
 
|}
 
|}
 +
 +
 +
==FC -vs- 90A beam stop correlation==
 +
 +
 +
FC = Aluminum brick 2" from exit window near NaI detectors
 +
 +
 +
50 Ohm scope termination
 +
{| border="1"  |cellpadding="20" cellspacing="0
 +
|-
 +
| 90 A BS (nVs) ||  FC  (nVs)
 +
|-
 +
| 47  ||  25
 +
|-
 +
|  24 ||  11.9
 +
|-
 +
| 13    ||  6 
 +
|-
 +
|  6.1    ||  2.3
 +
|-
 +
|  4.8  ||  1.8
 +
|}
 +
  
  
 
[[Positrons_Using_40Mev_Linac]]
 
[[Positrons_Using_40Mev_Linac]]

Revision as of 15:15, 14 October 2013

Run list

Scaler channel #2 counts the number of beam pulses

Detector 4 is Beam Left and in ADC channel 7, Ortec Dual Spec amp set to course=10, fine=39, Canberra CFD set to 85 mV lower threshold

Detector 1 is Beam Right and in ADC channel 3, Ortec Dual Spec amp set to course=20, fine=10, Canberra CFD set to 70 mV lower threshold


Run # Run Duration (s) Configuration
min s


FC -vs- 90A beam stop correlation

FC = Aluminum brick 2" from exit window near NaI detectors


50 Ohm scope termination

90 A BS (nVs) FC (nVs)
47 25
24 11.9
13 6
6.1 2.3
4.8 1.8


Positrons_Using_40Mev_Linac