Difference between revisions of "GEM performance data graphs"

From New IAC Wiki
Jump to navigation Jump to search
Line 33: Line 33:
 
|5526 || on || 11:51:35 ||12:02:49 || PMT TDC ch#0 GEM ch#2 ADC ch# 12  GEM Ch#14 PMT  
 
|5526 || on || 11:51:35 ||12:02:49 || PMT TDC ch#0 GEM ch#2 ADC ch# 12  GEM Ch#14 PMT  
 
|-
 
|-
 
+
|5528 || on || 12:21:28 || || 
 +
|-
  
  
 
|}
 
|}

Revision as of 18:44, 26 July 2013

ADC is connected,

Beam On: run 5496 as the detector is on 13:31:11 13:47:18 run 5497 as the detector is off 13:52:51


Run Number Beam Start Time End time Notes
5496 on 13:31:11 13:47:18 Detector is in operating voltage.
5497 on 13:52: 51 Detector is in off mode
5515 off 5:59: 46 6:27:43 Detector is in operating voltage.
5516 off 6:29:32 06:38:13 Detector is in off mode
5517 off 6:43:42 06:50:05 shutter is close
5518 off 06:55:59 07:06:57 Detector is in operating voltage.
5519 on 07:56:53 Detector is in operating voltage.
5520,21,22 on 09:38:36 Detector is in operating voltage.
5523 on 9:51:00 10:13:38 Detector is in operating voltage.
5524 on 10:14:35 PMT is added to ADC ch#14
5526 on 11:51:35 12:02:49 PMT TDC ch#0 GEM ch#2 ADC ch# 12 GEM Ch#14 PMT
5528 on 12:21:28