Difference between revisions of "R1 S6 SignalSearchLog"
Jump to navigation
Jump to search
(→STB-3) |
(→STB-4) |
||
Line 57: | Line 57: | ||
|} | |} | ||
− | ==STB-4== | + | ==STB-4 G1202275== |
{| border="1" |cellpadding="20" cellspacing="0 | {| border="1" |cellpadding="20" cellspacing="0 | ||
|- | |- | ||
− | |Layer || Wire || Date ||comments | + | |Layer || Wire || Channel || Date ||comments |
|- | |- | ||
− | | | + | | || || U15 || ||This Board presents a unusual noise in all the channels. The noise is a big positive spark, which makes difficult the recolection of signals. However, It was possible by setting a higher trigger level in the scope. |
|} | |} | ||
Revision as of 20:52, 9 May 2013
Testing procedure
Things that may cause "noise" that are actually due to your testing setup:
- STB boards not securely attached to chamber. Make sure center screws (ones attaching directly to the chamber, not the nylon stand-offs) are tightened to 14 in. lb's.
- Scope's termination set to 1Mohm. Set the scope to 50ohm termination.
- Lower bandwidth of 1 Ghz scope to 200 Mhz. This attenuates peak height, but also rejects high frequency noise and reduces the noise level from 55-65 mV to ~11-15 mV.
Super Layer 1
STB-1 G1202220
Layer | Wire | Channel | Date | Comments |
U1 | This channel presents higher noise level than the other ones, which makes difficult to get a signal with amplitude below 30mV. This behaviour extends to all the first channels of each connector in the board. however, if a high enough trigger level is set in the scope(~40mV), it is always possible to get a signal in these channels. | |||
U24 | Warm Wire: This is a channel that always triggers a fake signal. | |||
U38 | Warm Wire. | |||
U66 | HOT Wire: This is a channel that always triggers a fake signal very often. | |||
U87 | HOT Wire. | |||
U93 | HOT Wire. |
The rest of channels not mention here has a similar behaviour between them, with a noise level not greater than ~20mV.
STB-2 G1202266
Layer | Wire | Channel | Date | comments |
U38 | Hot wire. | |||
U40 | Warm wire. | |||
U51 | Hot wire. | |||
U65 | Hot wire. |
STB-3 G1202273
Layer | Wire | Channel | Date | comments |
U1 | Hot wire. | |||
U2 | Hot wire. | |||
U39 | Hot wire. | |||
U78 | Hot wire. |
STB-4 G1202275
Layer | Wire | Channel | Date | comments |
U15 | This Board presents a unusual noise in all the channels. The noise is a big positive spark, which makes difficult the recolection of signals. However, It was possible by setting a higher trigger level in the scope. |
STB-5
Layer | Wire | Date | comments |
STB-6
Layer | Wire | Date | comments |
STB-7
Layer | Wire | Date | comments |
Super Layer 2
STB-1
Layer | Wire | Date | comments |
STB-2
Layer | Wire | Date | comments |
STB-3
Layer | Wire | Date | comments |
STB-4
Layer | Wire | Date | comments |
STB-5
Layer | Wire | Date | comments |
STB-6
Layer | Wire | Date | comments |
STB-7
Layer | Wire | Date | comments |