Difference between revisions of "HRRL Dec 14 2012Run"
Jump to navigation
Jump to search
(Created page with "Run Plan 1.) Re-establish an electron beam with an energy >= 12 MeV so the OTR image is visible. 2.)tune a beam spot onto the phosphorous target which is wider in the horizonta…") |
|||
Line 7: | Line 7: | ||
[[12_10_2012_HRRL_DetectorTests]] | [[12_10_2012_HRRL_DetectorTests]] | ||
+ | |||
+ | |||
+ | |||
+ | = Emittance Measurement = | ||
+ | |||
+ | |||
+ | {| border="1" | ||
+ | | Energy Switch || Out (High En) | ||
+ | |- | ||
+ | | Solenoid 1 top || 16.2 A | ||
+ | |- | ||
+ | | Solenoid 2 bottom || 6.5 A | ||
+ | |- | ||
+ | | Gun Hor || -0.5 A | ||
+ | |- | ||
+ | | Gun Ver || -0.3 A | ||
+ | |- | ||
+ | | Output Hor || +6.9 A | ||
+ | |- | ||
+ | | Output Ver || +7.1 A | ||
+ | |- | ||
+ | | Rep Rate || 10 Hz | ||
+ | |- | ||
+ | | Gun HV || 10 (Knob Setting) | ||
+ | |- | ||
+ | | Gun Grid Voltage || 9.8 (Knob Setting) | ||
+ | |- | ||
+ | | RF frequency || 2856.097 MHz | ||
+ | |- | ||
+ | | Modulator HV Power Supply || 4.84 (Knob Setting) | ||
+ | |- | ||
+ | | RF macro Pulse Length (FWHM) || 300 ns | ||
+ | |- | ||
+ | |Q1 (A)|| 0 | ||
+ | |- | ||
+ | |Q2 (A)|| 0 | ||
+ | |- | ||
+ | |Q3 (A)|| 0 | ||
+ | |- | ||
+ | |Q4 (A)|| 0 | ||
+ | |- | ||
+ | |Q5 (A)|| 0 | ||
+ | |- | ||
+ | |Q6 (A)|| 0 | ||
+ | |- | ||
+ | | Beam Image on 0 deg OTR || [[File:hrrl_pos_13Dec2012_tune_otr1.jpg | 300 px]] | ||
+ | |- | ||
+ | |} |
Revision as of 16:14, 14 December 2012
Run Plan
1.) Re-establish an electron beam with an energy >= 12 MeV so the OTR image is visible.
2.)tune a beam spot onto the phosphorous target which is wider in the horizontal direction to account for the 45 degree angle of the screen with respect to the incident beam. Spot size should be less than 1 cm.