Difference between revisions of "12 10 2012 HRRL DetectorTests"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
Worked on evaluating the background after the installation of 8" thick Pb wall in accelerator room and installing a FC, Scintillator, and Phosphorous screen at the end of the 90 degree line. | Worked on evaluating the background after the installation of 8" thick Pb wall in accelerator room and installing a FC, Scintillator, and Phosphorous screen at the end of the 90 degree line. | ||
+ | |||
[[HRRL_Dec_12_2012Run]] | [[HRRL_Dec_12_2012Run]] | ||
Revision as of 04:54, 14 December 2012
12/12/12
Worked on evaluating the background after the installation of 8" thick Pb wall in accelerator room and installing a FC, Scintillator, and Phosphorous screen at the end of the 90 degree line.
12/13/12
Worked on establishing a small spot size on the Phosphorous target and then documenting the beam properties.