Difference between revisions of "Normalized and BKG subtracted data"
Jump to navigation
Jump to search
Line 26: | Line 26: | ||
[[File:87_source_subtr_bkg.png | 400 px]] | [[File:87_source_subtr_bkg.png | 400 px]] | ||
+ | ==Final calibration curve== | ||
[[File:Calibration_curve_corrected.jpg | 600 px]] | [[File:Calibration_curve_corrected.jpg | 600 px]] | ||
Hence, the slope is 0.1450 ns/cm or 6.89 cm/ns. | Hence, the slope is 0.1450 ns/cm or 6.89 cm/ns. |
Revision as of 23:06, 14 September 2012
For all the timing spectra it was calculated K1(left)-K2(right).
Source is 15.85 cm away from the left PMT
Source is 26.035 cm away from the left PMT
Source is 36.2 cm away from the left PMT
Source is 46.35 cm away from the left PMT
Source is 56.2 cm away from the left PMT
Source is 66.82 cm away from the left PMT
Source is 76.83 cm away from the left PMT
Source is 87 cm away from the left PMT
Final calibration curve
Hence, the slope is 0.1450 ns/cm or 6.89 cm/ns.