Difference between revisions of "HRRL Pos Test 27Jul2012 Data Ana 1 MeV"

From New IAC Wiki
Jump to navigation Jump to search
 
Line 1: Line 1:
  
 +
{| border="1"
 +
|-
 +
|run in||run out || NaI Left: in sub out || NaI Right: in sub out|| NaI Left: overlap in and out || NaI Right: overlap in and out ||e- rate (Hz)||e+ rate (Hz)||e+/e+ ratop || e- current (A)
 +
|-
  
  
Line 5: Line 9:
  
  
 +
 +
 +
|}
  
  
 
[[https://wiki.iac.isu.edu/index.php/Beam_Test_Jul_27_2012 go back]]
 
[[https://wiki.iac.isu.edu/index.php/Beam_Test_Jul_27_2012 go back]]

Revision as of 07:23, 10 September 2012

run in run out NaI Left: in sub out NaI Right: in sub out NaI Left: overlap in and out NaI Right: overlap in and out e- rate (Hz) e+ rate (Hz) e+/e+ ratop e- current (A)


[go back]