Difference between revisions of "201209 R1ProgressRep"
(→9/5/12) |
(→9/6/12) |
||
Line 19: | Line 19: | ||
=9/6/12= | =9/6/12= | ||
+ | |||
+ | Strung 21 Field wires on Sector 5 (now on SL1 - row 164). | ||
+ | |||
+ | Strung 24 Sense wires on Sector 6 (now on SL1 - row 213). | ||
+ | |||
+ | All wires strung on S5 and S6 were continuity tested to check for crossed wires. | ||
+ | |||
+ | Tension Trend tests were completed for both Sector 5 and Sector 6 chambers. | ||
+ | |||
+ | A complete cleanroom wipedown and clean was performed at the end of the work day. |
Revision as of 23:40, 6 September 2012
9/4/12
Strung 42 Field wires on Sector 5 (now on SL1 - row 152).
Strung 48 Sense wires on Sector 6 (now on SL1 - row 189).
The Physical Science building at ISU was evacuated at approximately 1pm by the fire and police departments after someone reported the smell of natural gas. A HAZMAT team was called in and the cause was found to be gases produced in a hood in the Chemistry Department. The hood had malfunctioned. We were evacuated until 5pm.
All wires on S6 were continuity tested. S5 will be tested tomorrow.
9/5/12
Strung 63 Field wires on Sector 5 (now on SL1 - row 161). Removed pretensioner C5 at row 160.
Strung 48 Sense wires on Sector 6 (now on SL1 - row 205).
All wires strung on S5 and S6 were continuity tested to check for crossed wires.
9/6/12
Strung 21 Field wires on Sector 5 (now on SL1 - row 164).
Strung 24 Sense wires on Sector 6 (now on SL1 - row 213).
All wires strung on S5 and S6 were continuity tested to check for crossed wires.
Tension Trend tests were completed for both Sector 5 and Sector 6 chambers.
A complete cleanroom wipedown and clean was performed at the end of the work day.