Difference between revisions of "Beam Test Jul 27 2012"
Jump to navigation
Jump to search
(→Tune) |
|||
Line 21: | Line 21: | ||
| Gun Grid Voltage || 10 (Knob Setting) | | Gun Grid Voltage || 10 (Knob Setting) | ||
|- | |- | ||
− | | RF frequency ||2856. | + | | RF frequency ||2856.315 MHz |
|- | |- | ||
| Modulator HV Power Supply || 4.19 (Knob Setting) | | Modulator HV Power Supply || 4.19 (Knob Setting) | ||
Line 29: | Line 29: | ||
|Q1 (A)|| -3 | |Q1 (A)|| -3 | ||
|- | |- | ||
− | |Q2 (A)|| +0 | + | |Q2 (A)|| +0 |
|- | |- | ||
|Q3 (A)|| +2 | |Q3 (A)|| +2 | ||
Line 39: | Line 39: | ||
|Q6 (A)|| 0 | |Q6 (A)|| 0 | ||
|- | |- | ||
− | | Current at FC0 || | + | | Current at FC0 || 100 mA |
|} | |} | ||
− | |||
=Beam Current Calibration of Scint Left= | =Beam Current Calibration of Scint Left= |
Revision as of 14:18, 27 July 2012
Tune
Energy Switch | Out (High En) |
Solenoid 1 | 13.9 A |
Solenoid 2 | 4.1 A |
Gun Hor | -0 A |
Gun Ver | +0.2 A |
Output Hor | -0.3 A |
Output Ver | -0 A |
Rep Rate | 17 |
Gun HV | 10 (Knob Setting) |
Gun Grid Voltage | 10 (Knob Setting) |
RF frequency | 2856.315 MHz |
Modulator HV Power Supply | 4.19 (Knob Setting) |
RF macro Pulse Length (FWHM) | 300 ns |
Q1 (A) | -3 |
Q2 (A) | +0 |
Q3 (A) | +2 |
Q4 (A) | 0 |
Q5 (A) | 0 |
Q6 (A) | 0 |
Current at FC0 | 100 mA |
Beam Current Calibration of Scint Left
Determine if the Beam Left Scintillator is linear with beam current.
run# | FC1 | Scint Left (Ch9) | Reprate | start | stop | Int Rate | comments |
3696 | 2335 | 17:30:08 | 17:31:39 ( s) | 11 events/s | first measurement at full current | ||
3697 | 59 | 17:: | 17:: ( s) | events/s | cut the current in half | ||
3698 | 17:: | 17:: ( s) | events/s | ||||
3699 | 100 px | 17:: | 17:: ( s) | events/s |
1. T1 out, disable D1, send the beam to FC0, take scope image of the area.
2. T1 in, enable D1, bend the beam by 90 deg, take a run with 1000 events.
Energy calibration of Scint 1
With T1 ande T2 out, send 1,2,6, and 10 MeV electrons to Scintillator 1 located at the end of the 90 degree beam line
Resume positron production using 10 MeV eletrons
Insert Gun trigger into VME scaler