Difference between revisions of "Beam Test Jul 26 2012"
Jump to navigation
Jump to search
Line 45: | Line 45: | ||
= DAQ runs = | = DAQ runs = | ||
− | TDC CH5 was a delay of (32+16+8+4+2+1+0.5) | + | TDC CH5 was a delay of (32+16+8+4+2+1+0.5)+ (16+8+4+2+1+0.5) = 95 nano second. |
{| border="1" |cellpadding="20" cellspacing="0 | {| border="1" |cellpadding="20" cellspacing="0 |
Revision as of 16:10, 26 July 2012
Tune
Energy Switch | Out (High En) |
Solenoid 1 | 13.9 A |
Solenoid 2 | 4.1 A |
Gun Hor | -0 A |
Gun Ver | +0.2 A |
Output Hor | -0.3 A |
Output Ver | -0 A |
Rep Rate | 17 |
Gun HV | 10 (Knob Setting) |
Gun Grid Voltage | 10 (Knob Setting) |
RF frequency | 2856.321 MHz |
Modulator HV Power Supply | 4.19 (Knob Setting) |
RF macro Pulse Length (FWHM) | 300 ns |
Q1 (A) | -3 |
Q2 (A) | +0.8 |
Q3 (A) | +2 |
Q4 (A) | 0 |
Q5 (A) | 0 |
Q6 (A) | 0 |
Current at FC0 | 96 mA |
DAQ runs
TDC CH5 was a delay of (32+16+8+4+2+1+0.5)+ (16+8+4+2+1+0.5) = 95 nano second.
run# | T1 | T2 | Sweep Magnet | logic | HV-D2L | HV-D1R | Reprate | start | stop | Int Rate | comments |
3679 | in | in | out | (DL & GunTrig) or (DR & GunTrig) | 1060V | 1080V | 100 | 08:48:00 | 09:28:01 | 42.3 events/s | ADC12 has Sintilator1 (Sint @ exit of 90 deg). |
3680 | in | OUT | out | (DL & GunTrig) or (DR & GunTrig) | 1060V | 1080V | 100 | 09:29:37 | 09:46:19 | 42.6 events/s | ADC12 has Sintilator1 (Sint @ exit of 90 deg). |
3682 | in | OUT | out | (DL & GunTrig) AND (DR & GunTrig) | 1150V | 1150V | 100 | 09:55:20 | :: | events/s | TDC cable was upside down, now it is flipped. Sintilator left was put to CH9. |