201112 R1ProgressRep: Difference between revisions

From New IAC Wiki
Jump to navigation Jump to search
Llim (talk | contribs)
Llim (talk | contribs)
Line 24: Line 24:


[[file:20111205_Temp1.png | 400 px]]
[[file:20111205_Temp1.png | 400 px]]
=12/6/11=
84 sense wires were strung today.
[[file:20111206_Temp1.png | 400 px]]

Revision as of 23:31, 6 December 2011

12/1/11

91 wires were strung today.

12/2/11

97 wires were strung today. All field wires are strung and the final tensioner has been removed.

12/3/11

Weekly trend measurement was done today.

12/5/11

Prior to rotating the chamber, I decided to do a thorough visual inspection to ensure no crossed wires. During this inspection, several wires were found that had kinks in them. These wires were replaced. Tensions were measured also.

Chamber has been rotated. Sense wire stringing has begun.

22 sense wires were strung today.

12/6/11

84 sense wires were strung today.

File:20111206 Temp1.png