Difference between revisions of "201112 R1ProgressRep"
Jump to navigation
Jump to search
m (→12/3/11) |
m (→12/5/11) |
||
Line 20: | Line 20: | ||
Chamber has been rotated. Sense wire stringing has begun. | Chamber has been rotated. Sense wire stringing has begun. | ||
+ | |||
+ | 22 sense wires were strung today. | ||
+ | |||
+ | [[file:20111205_Temp1.png | 400 px]] |
Revision as of 23:39, 5 December 2011
12/1/11
91 wires were strung today.
12/2/11
97 wires were strung today. All field wires are strung and the final tensioner has been removed.
12/3/11
Weekly trend measurement was done today.
12/5/11
Prior to rotating the chamber, I decided to do a thorough visual inspection to ensure no crossed wires. During this inspection, several wires were found that had kinks in them. These wires were replaced. Tensions were measured also.
Chamber has been rotated. Sense wire stringing has begun.
22 sense wires were strung today.