− | Chamber was rotated this morning. | + | Chamber was rotated this morning. |
+ | |||
+ | We started stringing SL1 mid-afternoon. We only managed 50 wires today. | ||
[[file:20111108_Temp1.png | 400 px]] | [[file:20111108_Temp1.png | 400 px]] | ||
+ | |||
+ | Temperature drop was caused by our power supply overheating. For future reference, don't exceed the rated 60 Amps of current... |
Revision as of 23:51, 8 November 2011
11/1/11
70 wires were strung today. Our second stringer should be starting tomorrow.
11/2/11
91 wires were strung today.
11/3/11
The correct HVAC filters came in today. A clean filter was installed today at ~10 AM. A small rise in temperature can be seen in the temperature graph when this change was made.
77 wires were strung today.
11/4/11
91 wires were strung today.
All field wires are strung on SL2.
11/7/11
Spent the day visually inspecting for crossed wires. We should have the chamber rotated tomorrow and hopefully back to stringing later in the afternoon.
11/8/11
Chamber was rotated this morning.
We started stringing SL1 mid-afternoon. We only managed 50 wires today.
Temperature drop was caused by our power supply overheating. For future reference, don't exceed the rated 60 Amps of current...