Difference between revisions of "September 22, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 47: Line 47:
 
R(bottom) = 2.45E-5 n/pulse -> × 180 Hz × 60 sec/min = <span style="color:red"> '''0.26 n/min'''</span><br>
 
R(bottom) = 2.45E-5 n/pulse -> × 180 Hz × 60 sec/min = <span style="color:red"> '''0.26 n/min'''</span><br>
 
R(upstream) = 17.4E-4 e+/pulse<br>
 
R(upstream) = 17.4E-4 e+/pulse<br>
<span style="color:red">About '''--%''' of photons are coming from the radiator according to PS. </span><br>
 
 
|-
 
|-
 
|<span style="color:red">'''2533'''</span>||Up<br> 90A||In ||Open ||In ||Out ||Out||DU cylinder  
 
|<span style="color:red">'''2533'''</span>||Up<br> 90A||In ||Open ||In ||Out ||Out||DU cylinder  
Line 53: Line 52:
 
R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = <span style="color:red"> '''-- n/min'''</span><br>
 
R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = <span style="color:red"> '''-- n/min'''</span><br>
 
R(upstream) = == e+/pulse<br>
 
R(upstream) = == e+/pulse<br>
<span style="color:red">About '''--%''' of photons are coming from the radiator according to PS. </span><br>
 
 
|-
 
|-
  

Revision as of 15:25, 22 September 2011

Go Back

Beam Parameters:

  • current 140 mA
  • pulse width 2 ns
  • rep rate 180 Hz
  • E = 25 MeV

Initial Test for Verification

Run # Beam Dump magnet Collim add coll Hardener 1" Al Radiator 25 um Al Target Comments
2527 Up
90A
In Open In Yes In D2O buttle Test radiator in/out.

R(bottom) = 2.09E-4 n/pulse -> × 180 Hz × 60 sec/min = 2.26 n/min
R(upstream) = 10.7E-3 e+/pulse

2528 Up
90A
In Open In Yes Out DU cylinder Test radiator in/out.

R(bottom) = 7.7E-6 n/pulse -> × 180 Hz × 60 sec/min = 0.083 n/min
R(upstream) = 6.6E-4 e+/pulse
About 94% of photons are coming from the radiator according to PS.

2530 Down
86A
In Open In Yes In DU cylinder Test radiator in/out.

R(bottom) = 1.7E-4 n/pulse -> × 180 Hz × 60 sec/min = 1.84 n/min
R(upstream) = 10.2E-3 e+/pulse

2531 Down
86A
In Open In Yes Out DU cylinder Test radiator in/out.

R(bottom) = 2.28E-5 n/pulse -> × 180 Hz × 60 sec/min = 0.25 n/min
R(upstream) = 9.7E-4 e+/pulse
About 91% of photons are coming from the radiator according to PS.

2532 Down
86A
In Open In Out Out DU cylinder Test radiator in/out.

R(bottom) = 2.45E-5 n/pulse -> × 180 Hz × 60 sec/min = 0.26 n/min
R(upstream) = 17.4E-4 e+/pulse

2533 Up
90A
In Open In Out Out DU cylinder Test radiator in/out.

R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = == e+/pulse

Production Runs

Run # Beam Dump magnet Collimator add coll Hardener 1" Al Radiator 25 um Al Target Comments
25-- Up
90A
In Open In Yes In DU cylinder Long production run: -- pulses (-- minute run)

R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse

25-- Down
86A
In Open In Yes In DU cylinder Long production run: -- pulses (-- minute run)

R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse

25-- Down
86A
In Open In Yes Out DU cylinder Long production run: -- pulses (-- minute run)

R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse

25-- Down
86A
In Open In Yes In None Long production run: -- pulses (-- minute run)

R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse


go up