Difference between revisions of "September 22, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 40: Line 40:
 
R(upstream) = 10.2E-3 e+/pulse
 
R(upstream) = 10.2E-3 e+/pulse
 
|-
 
|-
|<span style="color:red">'''2530'''</span>||Down<br> 86A||In ||Open ||In ||Yes ||Out||DU cylinder  
+
|<span style="color:red">'''2531'''</span>||Down<br> 86A||In ||Open ||In ||Yes ||Out||DU cylinder
 +
|align="left"|Test radiator in/out.
 +
-- pulses<br>
 +
R(bottom) = 2.28E-5 n/pulse -> × 180 Hz × 60 sec/min = <span style="color:red"> '''0.25 n/min'''</span><br>
 +
R(upstream) = 9.7E-4 e+/pulse<br>
 +
<span style="color:red">About '''--%''' of photons are coming from the radiator according to PS. </span><br>
 +
|-
 +
|<span style="color:red">'''2532'''</span>||Down<br> 86A||In ||Open ||In ||Yes ||Out||DU cylinder  
 
|align="left"|Test radiator in/out.
 
|align="left"|Test radiator in/out.
 
-- pulses<br>
 
-- pulses<br>

Revision as of 15:05, 22 September 2011

Go Back

Beam Parameters:

  • current 140 mA
  • pulse width 2 ns
  • rep rate 180 Hz
  • E = 25 MeV

Initial Test for Verification

Run # Beam Dump magnet Collim add coll Hardener 1" Al Radiator 25 um Al Target Comments
2527 Up
90A
In Open In Yes In D2O buttle Test radiator in/out.

-- pulses
R(bottom) = 2.09E-4 n/pulse -> × 180 Hz × 60 sec/min = 2.26 n/min
R(upstream) = 10.7E-3 e+/pulse

2528 Up
90A
In Open In Yes Out DU cylinder Test radiator in/out.

-- pulses
R(bottom) = 7.7E-6 n/pulse -> × 180 Hz × 60 sec/min = 0.083 n/min
R(upstream) = 6.6E-4 e+/pulse
About 0.94% of photons are coming from the radiator according to PS.

2530 Down
86A
In Open In Yes In DU cylinder Test radiator in/out.

-- pulses
R(bottom) = 1.7E-4 n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = 10.2E-3 e+/pulse

2531 Down
86A
In Open In Yes Out DU cylinder Test radiator in/out.

-- pulses
R(bottom) = 2.28E-5 n/pulse -> × 180 Hz × 60 sec/min = 0.25 n/min
R(upstream) = 9.7E-4 e+/pulse
About --% of photons are coming from the radiator according to PS.

2532 Down
86A
In Open In Yes Out DU cylinder Test radiator in/out.

-- pulses
R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse
About --% of photons are coming from the radiator according to PS.

Production Runs

Run # Beam Dump magnet Collimator add coll Hardener 1" Al Radiator 25 um Al Target Comments
25-- Up
90A
In Open In Yes In DU cylinder Long production run: -- pulses (-- minute run)

R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse

25-- Down
86A
In Open In Yes In DU cylinder Long production run: -- pulses (-- minute run)

R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse

25-- Down
86A
In Open In Yes Out DU cylinder Long production run: -- pulses (-- minute run)

R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse

25-- Down
86A
In Open In Yes In None Long production run: -- pulses (-- minute run)

R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse


go up