Difference between revisions of "September 22, 2011"
Line 21: | Line 21: | ||
! scope="col" width="44%" | Comments | ! scope="col" width="44%" | Comments | ||
|- | |- | ||
− | |<span style="color:red">'''2---'''</span>||Up<br> 90A||In ||Open ||In ||Yes ||Out|| | + | |<span style="color:red">'''2---'''</span>||Up<br> 90A||In ||Open ||In ||Yes ||Out||D2O buttle |
|align="left"|Test radiator in/out. | |align="left"|Test radiator in/out. | ||
-- pulses<br> | -- pulses<br> |
Revision as of 14:04, 22 September 2011
Beam Parameters:
- current -- mA
- pulse width -- ns
- rep rate -- Hz
- E = -- MeV
Initial Test for Verification
Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments |
---|---|---|---|---|---|---|---|---|
2--- | Up 90A |
In | Open | In | Yes | Out | D2O buttle | Test radiator in/out.
-- pulses |
2--- | Up 90A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
-- pulses |
2--- | Down 86A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
-- pulses |
2--- | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
-- pulses |
Production Runs
Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments |
---|---|---|---|---|---|---|---|---|
25-- | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (-- minute run) R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min |
25-- | Down 86A |
In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (-- minute run) R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min |
25-- | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Long production run: -- pulses (-- minute run) R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min |
25-- | Down 86A |
In | Open | In | Yes | In | None | Long production run: -- pulses (-- minute run) R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min |