Difference between revisions of "September 21, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 93: Line 93:
 
R(upstream) = -- e+/pulse<br>
 
R(upstream) = -- e+/pulse<br>
 
|-
 
|-
|<span style="color:blue">'''25--'''</span>||<span style="color:Crimson">'''Up'''</span><br> 90A||In ||Open ||In ||Yes ||In||DU cylinder
 
|align="left"|<span style="color:blue">'''Long production run: -- pulses (-- minute run)'''</span><br>
 
R(bottom) = -- n/pulse  -> × 180 Hz × 60 sec/min = <span style="color:Crimson"> '''-- n/min'''</span><br>
 
R(upstream) = -- e+/pulse<br>
 
|-
 
|<span style="color:blue">'''25--'''</span>||<span style="color:Lime">'''Down'''</span><br> 86A||In ||Open ||In ||Yes ||In||DU cylinder
 
|align="left"|<span style="color:blue">'''Long production run: -- pulses (-- minute run)<br>'''</span>
 
R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = <span style="color:Lime"> '''-- n/min'''</span><br>
 
R(upstream) = -- e+/pulse<br>
 
|-
 
|<span style="color:blue">'''25--'''</span>|| Down <br> 86A||In ||Open ||In ||Yes ||<span style="color:Teal">'''Out'''</span>||DU cylinder
 
|align="left"|<span style="color:blue">'''Long production run: -- pulses (-- minute run)<br>'''</span>
 
R(bottom) = -- n/pulse ->  × 180 Hz × 60 sec/min =  <span style="color:Teal"> '''-- n/min'''</span><br>
 
R(upstream) = -- e+/pulse<br>
 
|-
 
|<span style="color:blue">'''25--'''</span>|| Down <br> 86A||In ||Open ||In ||Yes ||In ||<span style="color:OrangeRed">'''None'''</span>
 
|align="left"|<span style="color:blue">'''Long production run: -- pulses (-- minute run)<br>'''</span>
 
R(bottom) = -- n/pulse ->  × 180 Hz × 60 sec/min =  <span style="color:OrangeRed"> '''-- n/min'''</span><br>
 
R(upstream) = -- e+/pulse<br>
 
|-
 
 
 
|}
 
|}
  
  
 
[https://wiki.iac.isu.edu/index.php?title=September_21,_2011 go up]
 
[https://wiki.iac.isu.edu/index.php?title=September_21,_2011 go up]

Revision as of 22:05, 21 September 2011

Go Back

Beam Parameters:

  • current 160 mA
  • pulse width <2 ns
  • rep rate 180 Hz
  • E = 25 MeV

Initial Test for Verification

Run # Beam Dump magnet Collimator add coll Hardener 1" Al Radiator 25 um Al Target Comments
2515 Up
90A
In Open In Yes Out DU cylinder Test radiator in/out.

144632 pulses
R(bottom) = 3.4E-5 n/pulse -> × 180 Hz × 60 sec/min = 0.37 n/min
R(upstream) = 8.57E-4 e+/pulse

2517 Up
90A
In Open In Yes In DU cylinder Test radiator in/out.

0 pulses
R(bottom) = 8.97E-4 n/pulse -> × 180 Hz × 60 sec/min = 9.69 n/min
R(upstream) = 17.7E-3 e+/pulse
About 95.2% of photons are coming from the radiator according to PS.

2519 Down
86A
In Open In Yes In DU cylinder Test radiator in/out.

0 pulses
R(bottom) = 7.9E-4 n/pulse -> × 180 Hz × 60 sec/min = 8.53 n/min
R(upstream) = 18.4E-3 e+/pulse

2520 Down
86A
In Open In Yes Out DU cylinder Test radiator in/out.

162652 pulses
R(bottom) = 1.2E-5 n/pulse -> × 180 Hz × 60 sec/min = 0.13 n/min
R(upstream) = 9.7E-4 e+/pulse
About 94.7% of photons are coming from the radiator according to PS.

Production Runs

Run # Beam Dump magnet Collimator add coll Hardener 1" Al Radiator 25 um Al Target Comments
2521 Up
90A
In Open In Yes In DU cylinder Long production run: -- pulses (60 minute run)

R(bottom) = 7.64E-4 n/pulse -> × 180 Hz × 60 sec/min = 8.25 n/min
R(upstream) = 16.89E-3 e+/pulse

2522 Up
90A
In Open In Yes In DU cylinder Long production run: -- pulses (90 minute run)

R(bottom) = 6.75E-4 n/pulse -> × 180 Hz × 60 sec/min = 7.29 n/min
R(upstream) = 15.84E-3 e+/pulse

2523 Down
86A
In Open In Yes In DU cylinder Long production run: 649324 pulses (60 minute run)

R(bottom) = 5.1E-4 n/pulse -> × 180 Hz × 60 sec/min = 5.54 n/min
R(upstream) = 12.6E-3 e+/pulse

2524 Down
86A
In Open In Yes In DU cylinder Long production run: -- pulses (90 minute run)

R(bottom) = 4.58E-4 n/pulse -> × 180 Hz × 60 sec/min = 4.95 n/min
R(upstream) = 12.1E-3 e+/pulse

2525 Down
86A
In Open In Yes Out DU cylinder Long production run: -- pulses (30 minute run)

R(bottom) = 1.7E-5 n/pulse -> × 180 Hz × 60 sec/min = 0.18 n/min
R(upstream) = 1.17E-3 e+/pulse

2526 Up
90A
In Open In Yes In None Long production run: -- pulses (60 minute run)

R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min
R(upstream) = -- e+/pulse


go up