Difference between revisions of "September 20, 2011"
| Line 23: | Line 23: | ||
|align="left"|Test radiator in/out. | |align="left"|Test radiator in/out. | ||
120664 pulses<br> | 120664 pulses<br> | ||
| − | R(bottom) = 0.0012 n/pulse <span style="color:red"> -> × 180 Hz × 60 | + | R(bottom) = 0.0012 n/pulse <span style="color:red"> -> × 180 Hz × 60 sec/min = '''12.9 n/min'''</span><br> |
R(upstream) = 0.0272 e+/pulse | R(upstream) = 0.0272 e+/pulse | ||
|- | |- | ||
Revision as of 19:27, 20 September 2011
summary what was been done
- current 140 mA
- pulse width 2 us
- rep rate 180 Hz
- E = 25 MeV
| Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments |
|---|---|---|---|---|---|---|---|---|
| 2502 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
120664 pulses |
| 2503 | Up 90A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
121258 pulses |
| 2504 | Down 86A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
R(bottom) = 0.00137 n/pulse -> ×180×60 = 14.8 n/min |
| 2505 | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
122247 pulses |
Production runs
| Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments |
|---|---|---|---|---|---|---|---|---|
| 2506 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run: 972556 pulses Operator said the beam is really jittery
R(bottom) = 0.0013 n/pulse -> ×180×60 = 14.0 n/min |
| 2507 | Down 86A |
In | Open | In | Yes | In | DU cylinder | Long production run: 973769 pulses
R(bottom) = 0.001298 n/pulse -> ×180 pulses/second×60 seconds/minute = 14.0 n/min |
| 2508 | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Long production run: pulses
R(bottom) = 6.6E-6 n/pulse -> ×180×60 = 0.07 n/min |
| 2509 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run: pulses
R(bottom) = 9.7E-4 n/pulse -> ×180×60 = 10.5 n/min |