Difference between revisions of "September 20, 2011"
Line 58: | Line 58: | ||
! scope="col" width="7.%" | add coll | ! scope="col" width="7.%" | add coll | ||
! scope="col" width="7.%" | Hardener 1" Al | ! scope="col" width="7.%" | Hardener 1" Al | ||
− | ! scope="col" width="7.%" | Radiator | + | ! scope="col" width="7.%" | Radiator 25 um Al |
! scope="col" width="7.%" | Target | ! scope="col" width="7.%" | Target | ||
! scope="col" width="44%" | Comments | ! scope="col" width="44%" | Comments |
Revision as of 19:11, 20 September 2011
summary what was been done
- current 140 mA
- pulse width 2 us
- rep rate 180 Hz
- E = 25 MeV
Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments |
---|---|---|---|---|---|---|---|---|
2502 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
120664 pulses |
2503 | Up 90A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
121258 pulses |
2504 | Down 86A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
R(bottom) = 0.00137 n/pulse -> ×180×60 = 14.8 n/min |
2505 | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
122247 pulses |
Production runs
Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments |
---|---|---|---|---|---|---|---|---|
2506 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run: 972556 pulses Operator said the beam is really jittery
R(bottom) = 0.0013 n/pulse -> ×180×60 = 14.0 n/min |
2507 | Down 86A |
In | Open | In | Yes | In | DU cylinder | Long production run: 973769 pulses
R(bottom) = 0.001298 n/pulse -> ×180×60 = 14.0 n/min |
2508 | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Long production run: pulses
R(bottom) = 0.00 n/pulse -> ×180×60 = .0 n/min |
2509 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run: pulses
R(bottom) = 0.00 n/pulse -> ×180×60 = .0 n/min |