Difference between revisions of "September 16, 2011"
Line 25: | Line 25: | ||
|<span style="color:red">2461</span>||Down<br> 86A||In ||Open ||Yes ||Down||DU cylinder | |<span style="color:red">2461</span>||Down<br> 86A||In ||Open ||Yes ||Down||DU cylinder | ||
|align="left"|Beam check-in run. | |align="left"|Beam check-in run. | ||
− | R(beam down) = 33/160084 = 0.0002061 n/pulse <span style="color:red">-> ×180×60 = 2.2 n/min<span><br> | + | R(beam down) = 33/160084 = 0.0002061 n/pulse <span style="color:red">'''-> ×180×60 = 2.2 n/min'''</span><br> |
R(upstream) = 990/160084 = 0.00618 e+/pulse<br> | R(upstream) = 990/160084 = 0.00618 e+/pulse<br> | ||
<span style="color:red">About 86% of photons are coming from the radiator according to PS. Good</span><br> | <span style="color:red">About 86% of photons are coming from the radiator according to PS. Good</span><br> | ||
Line 31: | Line 31: | ||
|<span style="color:red">2462</span>||Up<br> 90A||In ||Open ||Yes ||Up||DU cylinder | |<span style="color:red">2462</span>||Up<br> 90A||In ||Open ||Yes ||Up||DU cylinder | ||
|align="left"|Beam check-in run. | |align="left"|Beam check-in run. | ||
− | R(beam down) = 0.000362 n/pulse <span style="color:red">-> ×180×60 = 3.9 n/min<span><br> | + | R(beam down) = 0.000362 n/pulse <span style="color:red">'''-> ×180×60 = 3.9 n/min'''</span><br> |
R(upstream) = 1064/165434 = 0.00643 e+/pulse<br> | R(upstream) = 1064/165434 = 0.00643 e+/pulse<br> | ||
<span style="color:red">About 88% of photons are coming from the radiator according to PS. Good</span><br> | <span style="color:red">About 88% of photons are coming from the radiator according to PS. Good</span><br> |
Revision as of 17:16, 16 September 2011
summary what was been done
Run # | Beam | Dump magnet | Collimator | Hardener | Radiator 25 um Al | Target | Comments |
---|---|---|---|---|---|---|---|
2459 | Up 90A |
In | Open | Yes | Out | DU cylinder | Beam check-in run.
R(beam down) = 1/160279 = 0.0000062 n/pulse |
2460 | Down 86A |
In | Open | Yes | Out | DU cylinder | Beam check-in run.
R(beam down) = 0/160873 = 0 n/pulse |
2461 | Down 86A |
In | Open | Yes | Down | DU cylinder | Beam check-in run.
R(beam down) = 33/160084 = 0.0002061 n/pulse -> ×180×60 = 2.2 n/min |
2462 | Up 90A |
In | Open | Yes | Up | DU cylinder | Beam check-in run.
R(beam down) = 0.000362 n/pulse -> ×180×60 = 3.9 n/min |
2463 | Up 90A |
In | Open | Yes | Up | Out | Beam check-in run.
R(beam down) = 0 n/pulse |
2464 | Down 86A |
In | Open | Yes | Down | Out | Beam check-in run. Short beam off
R(beam down) = 0.000029 n/pulse |
2465 | Down 86A |
In | Open | Yes | Down | Out | Beam check-in run. Redoing 2465
R(beam down) = 3/160876 = 0.000019 n/pulse |
2465 | Down 86A |
In | Open | Yes | Down | Out | Long production run
R(beam down) = n/pulse |