Difference between revisions of "September 16, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 26: Line 26:
 
|align="left"|Beam check-in run.
 
|align="left"|Beam check-in run.
 
R(beam down) =  n/pulse<br>
 
R(beam down) =  n/pulse<br>
R(upstream) = = e+/pulse<br>
+
R(upstream) = 637/93003 = 0.00685 e+/pulse<br>
 +
<span style="color:red">About 92% of photons are coming from the radiator according to PS. Nice</span><br>
 
|-
 
|-
  

Revision as of 15:17, 16 September 2011

go back

summary what was been done

Run # Beam Dump magnet Collimator Hardener Radiator 25 um Al Target Comments
2459 Up 90A In Open Yes Out DU cylinder Beam check-in run.

R(beam down) = 1/160279 = 0.0000062 n/pulse
R(upstream) = 124/160279 = 0.00077 = e+/pulse

2460 Down 86A In Open Yes Out DU cylinder Beam check-in run.

R(beam down) = 0/160279 = 0 n/pulse
R(upstream) = 142/160873 = 0.00088 = e+/pulse

2461 Down 86A In Open Yes Down DU cylinder Beam check-in run.

R(beam down) = n/pulse
R(upstream) = 637/93003 = 0.00685 e+/pulse
About 92% of photons are coming from the radiator according to PS. Nice


go back