Difference between revisions of "September 15, 2011"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Line 11: | Line 11: | ||
| ==Radiator calibration== | ==Radiator calibration== | ||
| − | [File:Radiator calibration 9.15.11.png ] | + | [[File:Radiator calibration 9.15.11.png | 800px]] | 
Revision as of 15:09, 16 September 2011
The view flag was lost. So the vacuum was broken. During that time:
- the radiator was reinstalled so we have now both 10um and 25 um of Al radiator.
- radiator was recalibrated
- The collimation system and target was more precisely realign.
- The to left and right side 90 detectors was realign so now they are at the same level
