Difference between revisions of "September 13, 2011"
Line 32: | Line 32: | ||
|align="left"|<span style="color:red">Lost beam</span> | |align="left"|<span style="color:red">Lost beam</span> | ||
|- | |- | ||
− | | | + | |2388||Up 2 mm||In ||Open ||Up 2 mm||DU plate |
|align="left"|Beam check-in run. Hardener in as before. Target realignment, now the gammas hit the center of DU plate, which is as before 45/45 degree orientation | |align="left"|Beam check-in run. Hardener in as before. Target realignment, now the gammas hit the center of DU plate, which is as before 45/45 degree orientation | ||
R(beam 45 left) = n/pulse <br> | R(beam 45 left) = n/pulse <br> |
Revision as of 15:50, 13 September 2011
summary what was been done
Run # | Beam | Dump magnet | Collimator | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|
2385 | Up 2 mm | In | Open | Out | DU plate | Beam check-in run. Beam hardener off. DU plate 45/45 degree orientation and gammas hit the bottom right corner of plate from upstream view.
R(beam 45 left) = 6/173553 = 0.0000346 n/pulse |
2386 | Up 2 mm | In | Open | Up 2 mm | DU plate | Beam check-in run. 1" of Al hardener in front of upstream radiator.
R(beam 45 left) = n/pulse |
2387 | Up 2 mm | In | Open | Up 2 mm | DU plate | Lost beam |
2388 | Up 2 mm | In | Open | Up 2 mm | DU plate | Beam check-in run. Hardener in as before. Target realignment, now the gammas hit the center of DU plate, which is as before 45/45 degree orientation
R(beam 45 left) = n/pulse |