Difference between revisions of "September 13, 2011"
Line 13: | Line 13: | ||
|- | |- | ||
|2385||Up 2 mm||In ||Open ||Out||DU plate | |2385||Up 2 mm||In ||Open ||Out||DU plate | ||
− | |align="left"|Beam check-in run. Beam hardener off. DU plate 45/45 degree orientation. | + | |align="left"|Beam check-in run. Beam hardener off. DU plate 45/45 degree orientation and gammas hit the bottom right corner of plate from upstream view. |
R(beam 45 left) = 6/173553 = 0.0000346 n/pulse <br> | R(beam 45 left) = 6/173553 = 0.0000346 n/pulse <br> | ||
R(beam 45 right) = 0/583758 = 0.0 n/pulse<br> | R(beam 45 right) = 0/583758 = 0.0 n/pulse<br> |
Revision as of 15:29, 13 September 2011
summary what was been done
Run # | Beam | Dump magnet | Collimator | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|
2385 | Up 2 mm | In | Open | Out | DU plate | Beam check-in run. Beam hardener off. DU plate 45/45 degree orientation and gammas hit the bottom right corner of plate from upstream view.
R(beam 45 left) = 6/173553 = 0.0000346 n/pulse |
2386 | Up 2 mm | In | Open | Up 2 mm | DU plate | Beam check-in run. 1" of Al hardener in front of upstream radiator.
R(beam 45 left) = n/pulse |
2387 | Up 2 mm | In | Open | Up 2 mm | DU plate | Beam check-in run. Target realignment, now the gammas hit the center of DU plate, which is as before 45/45 degree orientation
R(beam 45 left) = n/pulse |