summary what was been done
Run # | Beam | Dump magnet | Collimator | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|
2359 | Centered | In | Open | Out | No | Test radiator in/out.
R(upstream) = 157/40244 = 0.0039 e+/pulse, |
2360 | Centered | In | Open | Centered | No | Test radiator in/out.
R(upstream) = 898/40244 = 0.0223 e+/pulse, |
2361 | Up 2 mm | In | Open | Up 2 mm | No | Test radiator in/out.
R(upstream) = 730/40839 = 0.0179 e+/pulse, |
2362 | Up 2 mm | In | Open | Out | No | Test radiator in/out.
R(upstream) = 172/41035 = 0.0042 e+/pulse, |
2363 | Up 2 mm | In | Open | Out | No | Test radiator in/out. Added 1" Al hardener against Cu bricks after vacuum window.
R(upstream) = 87/41037 = 0.0021 e+/pulse, |
2364 | Up 2 mm | In | Open | Up 2 mm | No | Test radiator in/out.
R(upstream) = 777/50837 = 0.0153 e+/pulse, |
2365 | Up 2 mm | In | Open | Up 2 mm | No | Test radiator in/out. Now 2" Al hardener against Cu bricks after vacuum window.
R(upstream) = 574/41235 = 0.0139 e+/pulse, |
2366 | Up 2 mm | In | Open | Out | No | Test radiator in/out.
R(upstream) = 117/41035 = 0.0028 e+/pulse, |
2367 | Down 2 mm | In | Open | Out | No | Test radiator in/out. Removed 2" Al hardener
R(upstream) = 160/41036 = 0.0039 e+/pulse, |
2368 | Down 2 mm | In | Open | Down 2 mm | No | Test radiator in/out.
R(upstream) = 628/40639 = 0.0154 e+/pulse, |
2369 | Down 2 mm | In | Open | Down 2 mm | No | Test radiator in/out. Added 1" Al hardener against Cu bricks after vacuum window.
R(upstream) = 454/40640 = 0.0111 e+/pulse, |
2370 | Down 2 mm | In | Open | Out | No | Test radiator in/out.
R(upstream) = 98/40639 = 0.0024 e+/pulse, |
2371 | Up 2 mm | In | Open | Up 2 mm | No | Test radiator in/out to reproduce previous result. Same 1" Al hardener against Cu bricks after vacuum window.
R(upstream) = 935/40641 = 0.0230 e+/pulse, |
2372 | Up 2 mm | In | Open | Out | No | Test radiator in/out.
R(upstream) = 153/40640 = 0.0038 e+/pulse, |
2373 | Up 2 mm | In | Open | Up 2 mm | DU plate | DU plate oriented 45 and 45 degree. Same 1" Al hardener upstream of collimator. |