Difference between revisions of "September 7, 2011"
Jump to navigation
Jump to search
Line 42: | Line 42: | ||
− | * upstream PS: 150 mV threshold, | + | * upstream PS: 150 mV threshold, 20 cnts/10,000 beam pulses |
− |
Revision as of 19:35, 7 September 2011
Wednesday Run Plan
- Tune up beam
- During this time, as much as possible tune up daq timing
- Kicker magnet calibration with viewscreen
- Pair spectrometer checkout/debugging
This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open versus blocked, ...
- Check detector rates with D2O. See if we can get a good time of flight spectrum.
Kicker magnet calibration with viewscreen
Pair-spectrometer threshold calibration with beam
By using analog counter. Beam On. Dump out. Collimator Open. Radiator in (10 um Al).
By using analog counter. Beam On. Dump out. Collimator Open. Radiator in (10 um Al).
was not done
By using TDC to count PS pulses (10,000 beam pulses). Beam On. Dump in. Collimator Open. Radiator in (10 um Al).
By using TDC to count PS pulses (10,000 beam pulses). Beam On. Dump in. Collimator blocked (see lab log books). Radiator in (10 um Al).
- upstream PS: 150 mV threshold, 19 cnts/10,000 beam pulses (19/545 -> about 96.5% of beam is coming trough collimator!!!)
- downstream PS: 150 mV threshold, 18 cnts/10,000 beam pulses (18/476 -> about 96.2% of beam is coming trough collimator!!!)
By using TDC to count PS pulses (10,000 beam pulses). Beam On. Dump in. Collimator blocked (see lab log books). Radiator out (10 um Al).
- upstream PS: 150 mV threshold, 20 cnts/10,000 beam pulses