Difference between revisions of "September 7, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 17: Line 17:
  
 
=Pair-spectrometer threshold calibration with beam=
 
=Pair-spectrometer threshold calibration with beam=
==By using analog counter. Beam On. Swip Off. Collimator Open.==
+
==By using analog counter. Beam On. Swip out. Collimator Open. Radiator on.==
  
 
[[File:Thresh upstream beam collim 090711.png || 600px]] [[File:Thresh downstream beam collim 090711.png || 600px]]
 
[[File:Thresh upstream beam collim 090711.png || 600px]] [[File:Thresh downstream beam collim 090711.png || 600px]]
  
  
==By using analog counter. Beam On. Swip Off. Collimator Open.==
+
==By using analog counter. Beam On. Swip out. Collimator Open. Radiator on.==
  
 
  was not done
 
  was not done
Line 28: Line 28:
  
  
==By using TDC to count PS pulses (10,000 beam pulses). Beam On. Swip On. Collimator Open.==
+
==By using TDC to count PS pulses (10,000 beam pulses). Beam On. Swip in. Collimator Open. Radiator on.==
  
  
 
[[File:Thresh upstream beam collim TDCdata 090711.png | 600px]][[File:Thresh downstream beam collim TDCdata 090711.png | 600px]]
 
[[File:Thresh upstream beam collim TDCdata 090711.png | 600px]][[File:Thresh downstream beam collim TDCdata 090711.png | 600px]]
  
==By using TDC to count PS pulses (10,000 beam pulses). Beam On. Swip On. Collimator blocked (see lab log books).==
+
==By using TDC to count PS pulses (10,000 beam pulses). Beam On. Swip in. Collimator blocked (see lab log books). Radiator on.==
  
 
   
 
   
 
* upstream PS: 150 mV  threshold, 19 cnts/10,000 beam pulses
 
* upstream PS: 150 mV  threshold, 19 cnts/10,000 beam pulses
 
* downstream PS: 150 mV  threshold, 18 cnts/10,000 beam pulses
 
* downstream PS: 150 mV  threshold, 18 cnts/10,000 beam pulses
 +
 +
==By using TDC to count PS pulses (10,000 beam pulses). Beam On. Swip in. Collimator blocked (see lab log books). Radiator out.==
 +
 +
 +
* upstream PS: 150 mV  threshold,  cnts/10,000 beam pulses
 +
* downstream PS: 150 mV  threshold,  cnts/10,000 beam pulses

Revision as of 19:25, 7 September 2011

go back


Wednesday Run Plan

  • Tune up beam
  • During this time, as much as possible tune up daq timing
  • Kicker magnet calibration with viewscreen
  • Pair spectrometer checkout/debugging
    This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open
     versus blocked, ...
  • Check detector rates with D2O. See if we can get a good time of flight spectrum.


Kicker magnet calibration with viewscreen

Pair-spectrometer threshold calibration with beam

By using analog counter. Beam On. Swip out. Collimator Open. Radiator on.

Thresh upstream beam collim 090711.png Thresh downstream beam collim 090711.png


By using analog counter. Beam On. Swip out. Collimator Open. Radiator on.

was not done


By using TDC to count PS pulses (10,000 beam pulses). Beam On. Swip in. Collimator Open. Radiator on.

Thresh upstream beam collim TDCdata 090711.pngThresh downstream beam collim TDCdata 090711.png

By using TDC to count PS pulses (10,000 beam pulses). Beam On. Swip in. Collimator blocked (see lab log books). Radiator on.

  • upstream PS: 150 mV threshold, 19 cnts/10,000 beam pulses
  • downstream PS: 150 mV threshold, 18 cnts/10,000 beam pulses

By using TDC to count PS pulses (10,000 beam pulses). Beam On. Swip in. Collimator blocked (see lab log books). Radiator out.

  • upstream PS: 150 mV threshold, cnts/10,000 beam pulses
  • downstream PS: 150 mV threshold, cnts/10,000 beam pulses