Difference between revisions of "September 7, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 31: Line 31:
  
  
[[File:Thresh downstream beam collim TDCdata 090711.png | 600px]]
+
[[File:Thresh downstream beam collim TDCdata 090711.png | 700px]]

Revision as of 18:15, 7 September 2011

go back


Wednesday Run Plan

  • Tune up beam
  • During this time, as much as possible tune up daq timing
  • Kicker magnet calibration with viewscreen
  • Pair spectrometer checkout/debugging
    This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open
     versus blocked, ...
  • Check detector rates with D2O. See if we can get a good time of flight spectrum.


Kicker magnet calibration with viewscreen

Pair-spectrometer threshold calibration with beam

Beam On. Swip Off. Collimator On.

Thresh upstream beam collim 090711.png Thresh downstream beam collim 090711.png


Beam On. Swip On. Collimator Off.

was not done


using TDC to count detector pulses. 10,000 beam pulses

Thresh downstream beam collim TDCdata 090711.png