===Wednesday Run Plan===
+
=Wednesday Run Plan=
  
 
* Tune up beam
 
* Tune up beam
Line 13: Line 13:
  
  
===Kicker magnet calibration with viewscreen===
+
=Kicker magnet calibration with viewscreen=
  
  
===Pair-spectrometer threshold calibration with beam===
+
=Pair-spectrometer threshold calibration with beam=
====Beam On. Swip Off. Collimator On.====
+
==Beam On. Swip Off. Collimator On.==
  
 
[[File:Thresh upstream beam collim 090711.png || 600px]] [[File:Thresh downstream beam collim 090711.png || 600px]]
 
[[File:Thresh upstream beam collim 090711.png || 600px]] [[File:Thresh downstream beam collim 090711.png || 600px]]
  
  
====Beam On. Swip On. Collimator Off.====
+
==Beam On. Swip On. Collimator Off.==
  
 
+
was not done
was not done
 

Revision as of 17:02, 7 September 2011

go back


Wednesday Run Plan

  • Tune up beam
  • During this time, as much as possible tune up daq timing
  • Kicker magnet calibration with viewscreen
  • Pair spectrometer checkout/debugging
    This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open
     versus blocked, ...
  • Check detector rates with D2O. See if we can get a good time of flight spectrum.


Kicker magnet calibration with viewscreen

Pair-spectrometer threshold calibration with beam

Beam On. Swip Off. Collimator On.

Thresh upstream beam collim 090711.png Thresh downstream beam collim 090711.png


Beam On. Swip On. Collimator Off.

was not done