Difference between revisions of "September 7, 2011"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Line 15: | Line 15: | ||
===Pair-spectrometer threshold calibration with cosmic. Beam On.  Swip Off. Collimator On. With guys doing beam up and beam down.===  | ===Pair-spectrometer threshold calibration with cosmic. Beam On.  Swip Off. Collimator On. With guys doing beam up and beam down.===  | ||
| − | [[File:Thresh downstream beam collim 090711.png   | + | [[File:Thresh downstream beam collim 090711.png || 500px]]  | 
| − | |||
| − | |||
===Pair-spectrometer threshold calibration with cosmic. Beam On.  Swip On. Collimator Off.===  | ===Pair-spectrometer threshold calibration with cosmic. Beam On.  Swip On. Collimator Off.===  | ||
Revision as of 16:51, 7 September 2011
Wednesday Run Plan
- Tune up beam
 - During this time, as much as possible tune up daq timing
 - Kicker magnet calibration with viewscreen
 - Pair spectrometer checkout/debugging
 
    This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open
     versus blocked, ...
- Check detector rates with D2O. See if we can get a good time of flight spectrum.
 
Pair-spectrometer threshold calibration with cosmic. Beam On. Swip Off. Collimator On. With guys doing beam up and beam down.
Pair-spectrometer threshold calibration with cosmic. Beam On. Swip On. Collimator Off.
was not did it