Difference between revisions of "September 7, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 15: Line 15:
 
===Pair-spectrometer threshold calibration with cosmic. Beam On.  Swip Off. Collimator On. With guys doing beam up and beam down.===
 
===Pair-spectrometer threshold calibration with cosmic. Beam On.  Swip Off. Collimator On. With guys doing beam up and beam down.===
  
====Current Connection====
 
*upstream: A5 
 
*downstream: A6
 
  
 
+
===Pair-spectrometer threshold calibration with cosmic. Beam On.  Swip On. Collimator Off.===
[[File:Thresh upstream cosmic.png || 600px]] [[File:Thresh downstream cosmic.png || 600px]]
 

Revision as of 15:37, 7 September 2011

go back


Wednesday Run Plan

  • Tune up beam
  • During this time, as much as possible tune up daq timing
  • Kicker magnet calibration with viewscreen
  • Pair spectrometer checkout/debugging
    This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open
     versus blocked, ...
  • Check detector rates with D2O. See if we can get a good time of flight spectrum.


Pair-spectrometer threshold calibration with cosmic. Beam On. Swip Off. Collimator On. With guys doing beam up and beam down.

Pair-spectrometer threshold calibration with cosmic. Beam On. Swip On. Collimator Off.