Difference between revisions of "HRRL OTR Test Feb 16th 2011"
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
3.) Determine which quad to use for emittance measurements. Establish a quad current scan range. | 3.) Determine which quad to use for emittance measurements. Establish a quad current scan range. | ||
+ | |||
+ | =Steps= | ||
+ | |||
+ | == Practise Turning HRRL On == | ||
+ | |||
+ | Make document of the hole process, write a Standard Operation Process (SOP). | ||
+ | |||
+ | == Turn RF off, Try to see Image with filament on== | ||
+ | |||
+ | If we can see filament spot on the OTR target, try to focus our image system. | ||
+ | |||
+ | == Turn RF On == | ||
+ | |||
+ | Turn RF on look at the images, take pictures of the image upload them to the wiki. | ||
Back to [[Positrons]] | Back to [[Positrons]] |
Revision as of 03:20, 16 February 2011
Objectives
1.) Check alignment of the OTR target and beam line with the linac's central axis. If it is misaligned we will work on an alignment plan to be executed after the Wednesday beam test.
2.) Take OTR images, check image focus and light output.
3.) Determine which quad to use for emittance measurements. Establish a quad current scan range.
Steps
Practise Turning HRRL On
Make document of the hole process, write a Standard Operation Process (SOP).
Turn RF off, Try to see Image with filament on
If we can see filament spot on the OTR target, try to focus our image system.
Turn RF On
Turn RF on look at the images, take pictures of the image upload them to the wiki.
Back to Positrons