Difference between revisions of "Geometry (25 MeV LINAC exit port)"
Jump to navigation
Jump to search
Line 30: | Line 30: | ||
=25 MeV geometry= | =25 MeV geometry= | ||
+ | ==geometry calculation== | ||
{| border="1" cellpadding="20" cellspacing="0" | {| border="1" cellpadding="20" cellspacing="0" | ||
Line 48: | Line 49: | ||
|} | |} | ||
− | + | ==geometry pictures== | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | ==geometry | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
===how it looks 1 (<math> \Theta_c/2</math>, box 3"x4" and then pipe 4")=== | ===how it looks 1 (<math> \Theta_c/2</math>, box 3"x4" and then pipe 4")=== |
Revision as of 05:36, 13 June 2010
Minimum accelerator energy to run experiment
The minimum energy of accelerator (MeV) is limited by fitting the collimator (
) into the hole ( )
1) Assuming the collimator diameter is
:
2) Assuming the collimator diameter is
:
3) Assuming the collimator diameter is
:
4) In general:
25 MeV geometry
geometry calculation
collimator diameter | |||||||
4.13 | 6.78 | 2.92 | 4.79 | ||||
4.13 | 6.78 | 1.46 | 2.40 |
geometry pictures
how it looks 1 ( , box 3"x4" and then pipe 4")
File:Vacuum pipe collimator .png
how it looks 2 ( , box 3"x4" and then pipe 4")
File:Vacuum pipe collimator .png