Difference between revisions of "Geometry (44 MeV LINAC exit port)"
Jump to navigation
Jump to search
| Line 22: | Line 22: | ||
<math>A_1C_1 = (286 +183)\cdot\tan(\Theta_K)\ cm</math> | <math>A_1C_1 = (286 +183)\cdot\tan(\Theta_K)\ cm</math> | ||
| − | <math>BD = 286\cdot\tan( | + | <math>BD = 286\cdot\tan(\Theta_C/m)\ cm</math><br> |
| − | <math>B_1D_1 = (286 + 183)\cdot\tan( | + | <math>B_1D_1 = (286 + 183)\cdot\tan(\Theta_C/m)\ cm</math><br> |
<math>\alpha = \frac{A_1D_1 - AB}{183} = \frac{(A_1C_1 + C_1D_1/2) - (AC - BD/2)}{183}</math> | <math>\alpha = \frac{A_1D_1 - AB}{183} = \frac{(A_1C_1 + C_1D_1/2) - (AC - BD/2)}{183}</math> | ||
Revision as of 22:41, 20 June 2010
90 exit port measurements
Critical and Kicker angles
general collimator setup
Vacuum pipe location ()
collimator location
1) center position:
(wall 1)
(wall 2)
2) collimator diameter:
(wall 1)
(wall 2)
collimator critical angle
from triangle :
minimal distance from the wall
from triangle FAB:
Vacuum pipe location ()
collimator location
1) center position:
(wall 1)
(wall 2)
2) collimator diameter:
(wall 1)
(wall 2)
collimator critical angle
from triangle :
minimal distance from the wall
from triangle FAB:
Funny pictures...
how it looks (, pipe 3")
how it looks 1 (, pipe 3")
how it looks 2 (, pipe 3")
how it looks 4 (, pipe (2 1/2)" and then pipe 4")
need to adjust to converter position
how it looks 5 (, box 3"x4" and then pipe 4")
need to adjust to converter position






