Created page with 'HRRL run on March 22-26 2010 Preliminary setup =3/17/10= Install detector infrastructure to mount 2 Drift chambers, 2 Scintillators and 1 GEM on a translator table. Install c...'
 
Oborn (talk | contribs)
Line 18: Line 18:


Check channels in histograms
Check channels in histograms
Coincidence: Coincidence between Accelerator's RF pulse generator, and several PMTs
TDC start: Accelerator RF pulse generator.
TDC stop:  2 DC, 1 GEM trigout, 4 PMTs
ADC: all FC channels from Accelerator ribbon cable.
ADC gate:  Create timing gate using scope when accelerator
V1495:  Trigger pulse from coincidence logic above


=3/22/10=
=3/22/10=

Revision as of 00:25, 20 March 2010

HRRL run on March 22-26 2010

Preliminary setup

3/17/10

Install detector infrastructure to mount 2 Drift chambers, 2 Scintillators and 1 GEM on a translator table.

Install collimation

3/18/10

Install all detectors and associated electronics (power supplies, cabling, gas lines,...)

3/19/10

install DAQ system and associated readout electronics.

Check channels in histograms


Coincidence: Coincidence between Accelerator's RF pulse generator, and several PMTs

TDC start: Accelerator RF pulse generator. TDC stop: 2 DC, 1 GEM trigout, 4 PMTs

ADC: all FC channels from Accelerator ribbon cable. ADC gate: Create timing gate using scope when accelerator

V1495: Trigger pulse from coincidence logic above

3/22/10

Final day for completing system checks

3/23/10

1pm - 5pm: Tune beam for low and high current

3/24/10

Positron spectrometer run plan

Detector tracking run plan