Difference between revisions of "HRRL CHIPS Logbook"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
− | [[Positrons]] | + | Go back to [[Positrons]] |
Revision as of 17:11, 29 October 2009
10/29/09
Met with IAC director Doug Wells and Khalid Chouffani at the IAC to determine the next steps on the positron project funded by DOE.
1.) Ask Mark Balzer to submit a report on the radiation dose measurements taken.
2.) Once report is digested, determine the HRRL shielding needed to move the accelerator to the wall as shown in Stancari's design.
Go back to Positrons