Difference between revisions of "HRRL 7-31-09"
Jump to navigation
Jump to search
Line 107: | Line 107: | ||
− | We had | + | We had runs for different beam energy (2 && 4 MeV) and collimator size(~0.2 && ~0.8 cm).<br> |
Table below shows TDC measurements for all cases for Metalica and Plastika. | Table below shows TDC measurements for all cases for Metalica and Plastika. | ||
Line 127: | Line 127: | ||
| 1306 || 2 || 0.8 || 1400:-700:980 || 50 || [[File:TDCSpectrum_1306.gif|200px]][[File:TDCSpectrum_1306_1.gif|200px]] | | 1306 || 2 || 0.8 || 1400:-700:980 || 50 || [[File:TDCSpectrum_1306.gif|200px]][[File:TDCSpectrum_1306_1.gif|200px]] | ||
|} | |} | ||
+ | |||
+ | [[File:HRRL_7-31-09_MetalicaPlastika_Start.png|250px]][[File:HRRL_7-31-09_MetalicaPlastika_Start_1.png|250px]] | ||
=VFAT runs= | =VFAT runs= |
Revision as of 05:29, 6 August 2009
Default HRRL running Conditions
Pulse Width | Rep Rate | Energy | |
8 mA | 100 ns | 1 Hz | 3 MeV |
cable names
CH ID | Description |
2223A1 | Front Scintillator |
2223A2 | Rear Scintilaltor |
2223A3 | ADC Gate From counting house to Experimental Cell |
2223A4 | TDC start pulse from counting house to experimental cell (PMT front + beam Gate) |
2223A5 | Coincidenc between front + rear Scint + Gun pulser to scaler channel 8 |
2223A6 | Metalica sense wire 4 |
2223A7 | Delayed rear PMT pulse to ADC |
2223A8 | Plastica sense wire 4 |
2223A9 | Plastica to scaler channel 4 |
2223A10 | Front scintillator to ADC |
2223A11 | Metalica scaler channel 1 |
2223A12 | DAQ trigger |
DAQ Ntuple names
Ntuple Variable | Description |
ADC5 | Front Scintilator |
ADC1 | Metalica sense wire 4 |
ADC16 | Rear Scintilator |
ADC13 | Plastica sense wire 4 |
TDC1 | Metalica sense wire 4 |
TDC3 | Plastika sense wire 4 |
ADC + Scaler + TDC + V1495
Run Number | Distance to Metallica's Feedthrough tip (cm) | Metalica scaler counts scaler ch 4 | Plastika Scaler Counts scaler ch 1 | Rear PMT + Front PMT + Gun Pulse Counts Scaler Ch 8 | HV S:F:G | Discriminator (mV) | Metalica counts/PMT+Gun pulse |
1263 | 19 | 0 | 1400:-700:980 | 50 |
TDC Measurements
TDC Calibration
Second pulse width is 80 ns.
- Conclusion
In order to get actual time between the start and the stop pulse, one needs to subtract the width of the second signal. In this case it was 80 ns.
I need to do one more calibration run, which i think is gonna explain some things.
Actual Measurements
We had runs for different beam energy (2 && 4 MeV) and collimator size(~0.2 && ~0.8 cm).
Table below shows TDC measurements for all cases for Metalica and Plastika.
VFAT runs
4 MeV beam energy, big collimator.
GEM HV settings:
=3425/3125.Run Number | Card 1 Threshold | Card 2 Threshold |
1300 | 151 | 116 |
1301 | 153 | 118 |
1302 | 155 | 120 |
1303 | 157 | 122 |
GEM HV settings:
=3425/3125.4 MeV beam energy, small collimator.
Run Number | Card 1 Threshold | Card 2 Threshold |
1305 | 151 | 124 |