Difference between revisions of "HRRL 4-13-09"

From New IAC Wiki
Jump to navigation Jump to search
Line 68: Line 68:
 
===GEM in Accelerator room===
 
===GEM in Accelerator room===
 
{| border="3"  cellpadding="20" cellspacing="0"
 
{| border="3"  cellpadding="20" cellspacing="0"
| Bag|| Rep Rate|| Current ||  
+
| Bag|| Rep Rate|| Current || Peak to peak noise
 
|-
 
|-
| Off|| 990 Hz || 3 V =60 mA  
+
| Off|| 990 Hz || 3 V =60 mA || 4 mV on 1 mus scale
 
|}
 
|}
  

Revision as of 22:24, 13 April 2009

Default HRRL running Conditions

[math]I_{peak}[/math] Pulse Width Rep Rate Energy
8 mA 25 ns 1 Hz 3 MeV


run plan

Date Task
4/11/09 Vaho stil running til 7 pm, configure Motion Sliders
4/12/09 Build shutter and unstack beam line
4/13/09 Install Aluminum brick shutter and interlock with HRRL, test beam transport: Run HRRL accelerator from 3pm til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, 8 mA peak)
4/14/09 Repair Freon leak in Chiller, HRRL down, Install DAQ
4/15/09 Run HRRL from 9 am til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, 8 mA peak), Do Plateau measurements and test readout
4/16/09 Run HRRL from 2 pm til 5 pm, position studies using Drift chamber and GEM
4/17/09 Run HRRL from 2 pm til 5 pm, efficiency tests
4/20/09 Run HRRL from 9 am til 5 pm finish detector tracking studies

4/13/09

Electron Dose tests

Shutter In

0.1 mrad/hr outside HRRL experimental door.

2.7 mrad/hr in the end of HRRL experimental hallway.

Shutter Out

0.1 mrad/hr in Dr. Forest office.

Sintillator tests

RS1 = 2 aluminum blocks are in front of Long BLue Scintillator plugged into the cable patch pannel 223A2

FS1 = Small scintillator is in 223A1


HV SC1 HV RS1 Desc.
840 840

GEM noise

100 ns RF pulse width

GEM in Accelerator room

Bag Rep Rate Current Peak to peak noise
Off 990 Hz 3 V =60 mA 4 mV on 1 mus scale

GEM in HRRL exp cell

Go Back Qweak