Difference between revisions of "HRRL 4-13-09"
Jump to navigation
Jump to search
Line 19: | Line 19: | ||
|4/12/09 || Install DAQ and Drift chambers | |4/12/09 || Install DAQ and Drift chambers | ||
|- | |- | ||
− | |4/13/09 || Install Aluminum brick shutter and interlock with HRRL, test beam transport: Run HRRL accelerator from 3pm til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, | + | |4/13/09 || Install Aluminum brick shutter and interlock with HRRL, test beam transport: Run HRRL accelerator from 3pm til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, 8 mA peak) |
|- | |- | ||
− | |4/14/09 || Run HRRL from 9 am til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, | + | |4/14/09 || Run HRRL from 9 am til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, 8 mA peak), Do Plateau measurements and test readout |
|- | |- | ||
|4/15/09 || Run HRRL from 2 pm til 5 pm, position studies using Drift chamber and GEM | |4/15/09 || Run HRRL from 2 pm til 5 pm, position studies using Drift chamber and GEM |
Revision as of 15:40, 1 April 2009
Default HRRL running Conditions
Pulse Width | Rep Rate | Energy | |
8 mA | 25 ns | 1 Hz | 3 MeV |
run plan
Date | Task |
4/11/09 | Install Motion Sliders |
4/12/09 | Install DAQ and Drift chambers |
4/13/09 | Install Aluminum brick shutter and interlock with HRRL, test beam transport: Run HRRL accelerator from 3pm til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, 8 mA peak) |
4/14/09 | Run HRRL from 9 am til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, 8 mA peak), Do Plateau measurements and test readout |
4/15/09 | Run HRRL from 2 pm til 5 pm, position studies using Drift chamber and GEM |
4/16/09 | Run HRRL from 2 pm til 5 pm, efficiency tests |
4/17/09 | Run HRRL from 9 am til 5 pm finish detector tracking studies |