Difference between revisions of "HRRL 4-13-09"

From New IAC Wiki
Jump to navigation Jump to search
(New page: = Default HRRL running Conditions= = run plan= {| border="3" cellpadding="20" cellspacing="0" | Date || Task |- |4/11/09 || Install Motion Sliders |- |4/12/09 || Install DAQ and Drift c...)
 
Line 1: Line 1:
 
= Default HRRL running Conditions=
 
= Default HRRL running Conditions=
 
+
{| border="1" cellpadding="20" cellspacing="0"
 +
|-
 +
| <math>I_{peak}</math>
 +
| Pulse Width
 +
| Rep Rate
 +
| Energy
 +
|-
 +
| 8 mA || 25 ns || 1 Hz|| 3 MeV
 +
|}
 +
<br>
  
 
= run plan=
 
= run plan=

Revision as of 15:40, 1 April 2009

Default HRRL running Conditions

[math]I_{peak}[/math] Pulse Width Rep Rate Energy
8 mA 25 ns 1 Hz 3 MeV


run plan

Date Task
4/11/09 Install Motion Sliders
4/12/09 Install DAQ and Drift chambers
4/13/09 Install Aluminum brick shutter and interlock with HRRL, test beam transport: Run HRRL accelerator from 3pm til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, 3 mA peak)
4/14/09 Run HRRL from 9 am til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, 3 mA peak), Do Plateau measurements and test readout
4/15/09 Run HRRL from 2 pm til 5 pm, position studies using Drift chamber and GEM
4/16/09 Run HRRL from 2 pm til 5 pm, efficiency tests
4/17/09 Run HRRL from 9 am til 5 pm finish detector tracking studies

Go Back Qweak