Difference between revisions of "Qweak TaskList"

From New IAC Wiki
Jump to navigation Jump to search
Line 5: Line 5:
 
|Status
 
|Status
 
| Task
 
| Task
 +
|-
 +
| 11/14/09
 +
| done
 +
| HV test Qweak detector
 
|-
 
|-
 
|  
 
|  
 
|  
 
|  
| HV test Qweak detector
 
|-
 
| 11/14/09
 
| done
 
 
|Measure GEM trigout rates -vs- HV
 
|Measure GEM trigout rates -vs- HV
 
|-
 
|-

Revision as of 03:46, 26 January 2009

Remaining tasks for installing R1.

Start Date Status Task
11/14/09 done HV test Qweak detector
Measure GEM trigout rates -vs- HV
Measure GEM tracking resolution
Measure GEM QE and uniformity
Measure GEM DAQ rate tests using e-beam (what is our max DAQ rate for the system Detector + electronics+CODA)
Hit Pattern GUI from V1495 output
HV remote control software (steve wood has solution we need to copy)
Quick Release GEM detector to rotator attachment system
8/27/07 VFAT control and Monitoring Web interface


Go Back Qweak