Difference between revisions of "October 17, 2008"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
Ran accelerator for 30 minutes with <math> H_{2}O </math> target. | Ran accelerator for 30 minutes with <math> H_{2}O </math> target. | ||
+ | |||
+ | We switched detectors A and C and ran the accelerator for 1 hour broken into 2 separate 30 minute runs. | ||
Took a timing spectrum with an empty plastic water bottle (the exact same type of bottle holding the <math> H_{2}O </math> and the <math> D_{2}O </math> targets). | Took a timing spectrum with an empty plastic water bottle (the exact same type of bottle holding the <math> H_{2}O </math> and the <math> D_{2}O </math> targets). | ||
− | Took a timing spectrum with no target at all. | + | Took a timing spectrum with no target at all. |
[http://www.iac.isu.edu/mediawiki/index.php/October_Fission_HRRL_Measurements_2008 Go Back] | [http://www.iac.isu.edu/mediawiki/index.php/October_Fission_HRRL_Measurements_2008 Go Back] |
Revision as of 00:08, 18 October 2008
Ran accelerator for 2.5 hours with
target.Ran accelerator for 30 minutes with
target.We switched detectors A and C and ran the accelerator for 1 hour broken into 2 separate 30 minute runs.
Took a timing spectrum with an empty plastic water bottle (the exact same type of bottle holding the
and the targets).Took a timing spectrum with no target at all.